Your planning checklist
0 of 10 planning items noted. Site approval requires SIPJOLT’s assessment.
The published starting requirements
Your property provides the location, a standard electrical outlet, a small storage closet, and access to a utility sink. SIPJOLT confirms the footprint, electrical details, water needs, clearances, and delivery access during site assessment.
Useful context for the site discussion
Identify the intended audience, a candidate common area, access hours, the city and state, servicing access, storage, and any target date. If you have facilities measurements or photos, discuss how SIPJOLT would like to receive them.
School policies, campus payment systems, public procurement, concession arrangements, and building access restrictions can affect the site plan. Include the requirements that actually apply.
From a completed checklist to a site review
A completed planning checklist is not an installation approval. SIPJOLT reviews the actual station footprint, utilities, clearances, access, and operating responsibilities for the proposed location.
The typical path is about 30 to 60 days from the first conversation to the first cup when the site is awarded and ready. Access, procurement, logistics, and site preparation affect the agreed schedule.
Questions for your property
Does checking every item approve a site?
No. These are planning notes. SIPJOLT confirms fit and requirements through the proposal and site assessment.
Are checklist answers uploaded?
No. The checkboxes run locally in your browser and are not submitted or stored.
What if a requirement is unknown?
Leave it unchecked and raise it during the site conversation. Do not guess electrical, water, drainage, or clearance requirements.